Horizontal Auger Boring

Installation of a steel casing by simultaneously jacking and removing soil from within the sleeve by means of a mechanical auger.  This technology has been in use for many decades, and is still a desirable and cost effective procedure for selected projects.  Commonly utilized for highway and railroad track crossings. Casing sizes from 4” to 36” in diameter.